安裝經理崗位職責
安裝經理法國賽科技術工程集團中國總公司賽科工業科技開發(武漢)有限公司,法國賽科技術工程集團中國總公司,賽科工業,賽科Responsibility:
?Organizeinstallationkickoffmeetingwithallofrelevantteams(SEC/production/maintenance/EPcontractormanagementetc…projectteamandevenMMWteamiftheyareavailable)?atleasttwoorthreeweeksbeforeinstallation.
?Defineinstallationarea.Andshowbigmillstones:SI;R1;RF.
?Defineinstallationcargoflowneeded.
?Defineinstallationareaisolationtype.
?Analyzeriskandimpactsolution:forexample_woodenpalletsinsideofworkshopetc.
?Answeranyshoportheotherteam’srequestaboutsafetyandsiteorganization_impactforproductionflowsafetydoubtetc.
?Affairleader:reviewreceptionprotocol(CI/R1)forproductionandmaintenanceteam.
?GEengineershouldattendalsothemeetingifwehaveimpactforproductionduringenergyconnection.Showtheshutdownneededperiodneeded.
?Actionlistduringkickoffmeetingshouldrecordedbymeetingorganizer/SEC,andshareMOMatthefirsttimeandfolloweachactionlinebeforeinstallation.ActionfollowedbyMeetingSECAffairleaderandChefdeChantier.
?DefineMDPmeetingscheduleandparticipantsduringinstallation:Maintenance/ShopBU/ShopTechnicianandSECengineersshouldbeattendit_2or3times/weekandadjustthescheduleandfrequencyaccordinginstallationorstartuprequest
?RemindinstallationareasafetyrulestogetherwithEP:FullPPEisobligatoryrequestedininstallationareauntilinstallationarea’sprotectionisolationremoved.
?Rules:beforeR1fullPPEismandatory.
?Beforeinstallation:areahandoverfromShopteamtoSEC.Documentneedtobesignedshopmanager/installationmanagerandEPcontractormanagementteamengineer.
?Afterinstallation:handoverfromSECtoworkshop:concernedpersons:SEC,ShopManagerandEP.
?PrepareshutdownrequestofSEC,attendshutdownmanagementmeeting.
?Engineer(Mec/Elec)preparepreventionplanandAuthorizationofWorkforeachsupplier
?BE&GEinternalmeetingneeded,guarantycivilandenergysupplyontimeandavoidhavingtoomanyco-activities.
?Realizeinstallationareaprotectionandputwarninglabel,installationgeneralinformation.
?Wellcommunicationwithshopteamduringwholeinstallationperiodduring
?Dailysitesupervision,focusonSafety—EnvironmentSafetyCondition/SafetyRulesfollowsituationbySub-contractors;schedule;housekeepingetc.
?Sitelogisticcoordination:loading&unloading,transportationonsite,storage.
?Chefdechantier_managealsositeequipmentstoragearea,andtemporaryofficesareasusingbysuppliers.
?ChefdechantierisinchargealsoSite“logisticCoordinatorofequipment”
?Atleasttohavebasicliftingknowledgerequested.Liftingprogramchecking,liftingoperationfollowupandbigheavypartsmovementtoinstallationarea.
?Workingpermitvalidationinsideofinstallationarea?Chefdechantier
?MDPfollowupatleastbeforeR1.
?ParticipateincidentoraccidentanalyzemeetingwithEP&Engineer.
Requirement:
?高度的安全和質量意識
?供應商管理
?和安全部溝通經驗
?在3年以上工作經驗(汽車及相關行業優先)
?熟練使用計算機(Excel,Word,MS-Project)
?跨部門溝通技巧
?執行能力
?掌握基本的機械技術
?書寫問題清單,并且跟蹤處理
篇2:安裝公司(行政副職)經理安全職責
1、經理是本單位安全生產第一責任者,對本單位安全生產負全面領導責任。
2、認真貫徹執行國家及上級有關安全生產方面的方針、法規、政策和規定,熟悉并執行安全規程制度和有關施工安全規程,認真落實在外施工單位的安全工作規定。保證本單位的安全生產目標的實現。
3、組織制定本單位安全生產責任制和實現安全生產目標,支持安全生產的“五同時”即在計劃、布置、檢查、總結、評比生產工作的同時,計劃、布置、檢查、總結、評比安全工作。
4、支持專、兼職安全員的工作,搞好各級、各類人員安全教育和現場監察工作,發現隱患及時整改。
5、親自審核簽發施工方案,明確安全職責,組織各部門各負其責,密切配合,共同做好安全工作。
6、每月主持召開一次本單位安全分析會,總結經驗,吸取教訓,制定相應的規定和要求,并參加公司安全分析會。
7、經常對職工進行安全思想教育、安全制度教育,定期組織安全操作規程教育。
8、嚴格執行承包工程、外包工、臨時工的使用規定,履行安全管理職責。
9、根據《國家電網公司電業生產事故調查規程》、《國家電網公司農電事故調查與統計規定》的規定,主持和參加傷亡事故的調查、處理和分析,制定有效防范措施,防止傷亡事故再度發生。
篇3:機電安裝項目副經理崗位職責
機電設備安裝項目副經理崗位職責
(1)協助項目經理工作,具體負責整個酒店機電安裝項目的管理工作。
(2)組織實施公司質量、環境、職業安全健康體系文件,對整個酒店機電安裝項目的質量、環境、職業安全健康負責。
(3)負責整個酒店機電安裝項目管理范圍內環境、安全、消防工作的檢查和管理工作,組織編制應急響應預案。負責輕傷、重傷事故調查處理后需要實施的整改。
(4)參加由業主、監理、總包主持召開的施工協調會,保證業主、監理的意見得到有效的貫徹。
(5)審核整個酒店機電安裝項目的作業人員計劃、施工機具計劃、監視和測量設備計劃、月度生產計劃、采購計劃;審批材料預算、月度要料計劃。
(6)主持召開整個酒店機電安裝項目的每月生產協調會議,總結當月生產以及質量、環境、安全、消防工作情況,安排下月生產計劃,并形成工作量報表。